(Hotel Delfino Blue, Corfu) |
25.5 m2 solar panels |
Payback Period: years: 3 |
Rooms/Beds: 15/75 |
Boiler 1500lt |
Budget: 16.000€ |
Hot water for use |
% Solar Coverage: 95% |
Annual Saving: 5.250€ |
http://delfinoblu.gr/ |
Emissions: 6.404kg CO2 |
Total Saving (25 years): 102.750€ |
Hotels
Hotel Delfino Blue -Solar Thermal System
- Details
- Category: Hotels
