"ANDRIANOS" successfully completed the works of supply and installation of a new boiler in the Hospital of Peloponnese Sparta. The project was undertaken by "ANDRIANOS", after its participation in an open public tender.
At the General Hospital of Sparta was installed a steel oil pressure boiler, of the house THERMOLEV, power 1,000,000 (Kcal / H), of high technological level and efficiency with a percentage of more than 92%, while they have all the necessary certifications DIN 17100, 4702 and C marking. The supply for the Sparta Hospital, in addition to a new boiler, also included a new two-stage burner.
The two-stage burner installed is of the Italian company RIELLO, type RL 130 t.L, suitable for burning light oil. RL series burners are certified according to European regulations EN 267, EN 676 and E.M.C. 89/336 / EEC, L.V.73 / 23 / EEC, GAS 90/396 / EEC and their performance is measured in accordance with Directive 92/42 / EEC.
The installation at the Hospital of Sparta was carried out by Mr. Tsakalakis Dimitris, licensed Thermohydraulic and exclusive partner of ANDRIANOS in the Prefecture of Laconia.