| +30 27210 23124
Αναζήτηση
30 years andrianos tiny
Εγκατάσταση νέων συγκροτημάτων αντλιών θερμότητας στο Νοσοκομείο Καλάμάτας

    

The works on the expansion of the central heating of the Kalamata Hospital are being successfully developed, with the addition of four sets of Heat Pumps, for the autonomy of all the Fan Coils of the building, from the central air conditioning system.The project has been undertaken by "ANDRIANOS" after its participation in an electronic public open international tender, and is funded by the OPESD program (Operational Program Environment & Sustainable Development) and specifically by Priority Axis 1 for the Protection of the Atmospheric Environment - Environment Renewable energy sources.

In detail, the project includes the supply and installation of 6 Heat Pumps, 3 Central Air Conditioning Units and 130 Fan Coil Units (FCUs), including the necessary equipment for their connection to the existing air conditioning network of the Hospital. Guided by the quality of technical solutions, the Heat Pumps AQUASNAP 30RQ, the Air Conditioning units 39HQ and the Fan Coil 42N units of Carrier were selected, which are machines of low energy consumption, high quality and reliability.

 

Carrier Corporation is a leading manufacturer of air conditioning, ventilation, heating, industrial cooling, control and automation systems. It offers sustainable solutions for home, commercial and industrial building applications and is the first air conditioning company introduced to the Greek market in 1952 and since then is present with various forms of representation. ANDRIANOS, since 2013, is a strategic commercial partner of AHI CARRIER N.A. EUROPE A.E. in terms of wholesale for all of Greece.

The implementation works of the project are progressing at a fast pace and their successful development is due to:

  • proper planning in the organization and management of the project,
  • in good Knowledge of the object of the project,
  • the excellent cooperation of the responsible engineers and the technical staff,
  • in the catalytic cooperation of της «ΑΝΔΡΙΑΝΟΣ» με το τεχνικό τμήμα της «AHI CARRIER N.Α. ΕΥΡΩΠΗΣ A.E»,
  • in the perfect cooperation of the contractor of the project with the Technical Service of the General Hospital of Kalamata.

The project is expected to be completed by ANDRIANOS and delivered to the Technical Service of Kalamata Hospital, within the next week, while the multiple benefits of this project will be immediately visible:

  • with a significant reduction in the consumption for heating and cooling of the building and increased quality of heating and cooling in the Hospital.
  • reduction of maintenance costs and breakdowns since for at least a decade there will be modern and new machines instead of obsolete ones, which showed breakdowns and many repair costs every year.
  • availability of spare parts as guaranteed by the manufacturer.
  • functional autonomy of four critical departments of the Hospital, from the central air conditioning system.

For 20 years, "ANDRIANOS" has been dealing with cutting-edge technologies in heating, air conditioning and energy saving, providing high performance and efficient products. It offers the development of the place and the society, investing in the study and know-how of dynamic sectors in the direction of RES, energy saving and environmental protection, with quality projects and quality building installations with low operating costs, without technical problems and with respect for the environment.

  

The unloading of the new 39HQ Central Air Conditioning Units of Carrier House, at Kalamata Hospital

   

Installation works of the new Fan Coil in the premises of the Hospital

 

Newsletter

I like to be informed about the latest energy solutions and the best deals!

Share it!

Credit and debit cards accepted

Basic Info

ANDRIANOS - World Leading Energy Saving Technologies

Address:
Platonos 30, Kalamata 241 00

Phone:
+30 2721 023124
+30 2721 088151

Fax: 2721 096522

Email:

Working hours

Monday         8AM–5PM
Tuesday         8AM–5PM
Wednesday   8AM–5PM
Thursday       8AM–5PM
Friday             8AM–5PM
Saturday        Closed
Sunday           Closed

(Time Zone: GMT+3)

ANDRIANOS ENERGY SAVING

Find us on map